MIL-DTL-62265C(AT)
TABLE VII. Classification of inspections - Continued.
First article
Initial
Require-
Preproduction
Production
Conform-
Examin-
Title
ment
Method
1
2
341234
ance
ation
Flow
3.4.8
4.9.8
X
X
fatigue
Relief valve
3.4.9
4.9.9
Cracking
3.4.9.1
4.9.9.1
X
X
pressure
Flow
3.4.9.2
4.9.9.2
X
X
capacity
Reseat
3.4.9.3
4.9.9.3
X
X
pressure
Endurance
3.4.9.4
4.9.9.4
X
X
X
XXXXX
3.5
4.10
Interface
requirements
Dimensional
3.5.1
4.10.1
X
constraints
Weight
3.5.2
4.10.2
X
X
X
XXXX
X
3.6
4.11
Support and
ownership
requirements
Identification
3.6.1
4.11.1
X
marking
Workmanship
3.6.2
4.11.2
X
3.7
4.12
Operating
environmental
requirements
Low
3.7.1
4.12.1.1
X
X
X
XXXXX
temperature
Vibration
3.7.2
4.12.2
X
X
X
XXXXX
Shock
3.7.3
4.12.3
X
X
4.2.1 Preproduction inspection. When specified (see 6.2), first article preproduction shall
be performed on four valve assemblies.
4.2.2 Initial production inspection. Unless otherwise specified (see 6.2), first article initial
production shall be performed on four valve assemblies randomly selected from the first ten
production valves produced.
10
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business